Part 2 of 3 in the series Chief Architect Blast Radius Approaches: An eCommerce Platform Case Study on AWS.
In Part 1 we built a map, from production traffic, of which dependencies can stop which customer journeys. This part covers the architecture decisions we made with that map: how far one failure is allowed to reach across our ten domains, and how we roll those decisions out.
A quick recap
Our platform runs ten business domains and five critical customer journeys: sign-up, browse, checkout, delivery and renewal. For every dependency, the platform measures how often its failure also fails its caller. That number is the Coupling Score.
- Blocking (0.8 or higher): if it fails, the customer’s journey stops.
- Degradable (0.2 or lower): if it fails, the journey carries on with less.
- Inconclusive (in between, or too little evidence): we keep watching.
A dependency’s blast radius is the set of journeys it can stop. Every ADR below exists to keep that set small.
Architecture decision records (ADRs)
Twenty-two decisions on how far one failure is allowed to reach. Each ADR names the dependency it governs, mostly from the domain table in Part 1, and states its consequence in blast-radius terms.
|
ADR |
Title |
Dependency it governs |
Context |
Decision |
Consequences |
Alternatives rejected |
|---|---|---|---|---|---|---|
|
ADR-001 |
Measure blast radius from production traffic |
Every service-to-service call |
Design docs and sampled traces don’t show which dependencies really stop a journey |
Score every call daily from the shared client library. The dependency map is the source of truth |
+ We see each service’s real blast radius. − Client library becomes mandatory |
Sampled tracing; manual registers |
|
ADR-002 |
Blocking dependencies are approved exceptions |
Today’s approved list: price calculation, payment authorization, renewal billing |
Unapproved Blocking dependencies silently widen a journey’s blast radius |
Each critical journey keeps an approved Blocking list. Everything else must be Degradable |
+ A journey’s blast radius is limited to its approved list. − Teams build fallbacks |
Higher SLOs on every callee |
|
ADR-003 |
Tier services by the journeys they can stop |
Every service on the map |
Thousands of services can’t be prioritized by debate |
Nightly job tiers every service. Tier 1: stops a journey where the customer pays or receives what they paid for (checkout, delivery, renewal). Tier 2: stops another critical journey. Tier 3: stops none |
+ Fixes go to the widest blast radius first. − Tiers shift with the map |
Team self-assessment |
|
ADR-004 |
Every remote call has a deadline |
Partner provisioning API, inventory availability |
A slow dependency holds threads, so its blast radius spreads to its callers’ callers |
A deadline set at the edge travels with the request; each call gets a share |
+ Slowness stays one hop wide. − Budgets need tuning |
Library default timeouts |
|
ADR-005 |
Circuit breakers on Degradable dependencies |
Offer eligibility, inventory availability, promo code validation |
Callers keep calling a failing Degradable dependency until they fail too |
The breaker trips and the agreed fallback is served |
+ Degradable stays Degradable under load. − Each fallback must be built |
Retries alone |
|
ADR-006 |
Bulkheads per dependency |
Checkout → saved addresses, promo code validation |
One slow dependency exhausts shared pools and stalls unrelated checkout steps |
Separate connection and thread pools per dependency |
+ A failure is confined to its own feature. − More pools to size |
One shared pool |
|
ADR-007 |
Each domain owns its data |
Customer profile, tier management, subscriptions |
A shared database is a hidden Blocking dependency for every domain on it |
One database per domain; integration through APIs and events only |
+ Removes a platform-wide blast radius. − Some data duplication |
Shared schema |
|
ADR-008 |
Orders don’t wait for fulfillment |
Order placement → fulfillment |
A warehouse or digital-delivery outage would stop order placement |
Accept the order; fulfillment picks it up from an event queue (EventBridge, SQS) |
+ A fulfillment outage delays delivery instead of stopping new orders. − Fulfillment needs its own delivery-promise target and backlog alerts |
Synchronous fulfillment calls |
|
ADR-009 |
Browse survives catalog and offers outages |
Product page → inventory availability, offer eligibility |
Browse calls both on every page |
Serve both from cache with bounded staleness; recalculate price at checkout |
+ Catalog and offer outages don’t reach browse. − Brief stale offers |
Always-live reads |
|
ADR-010 |
Payment and order writes are idempotent |
Payment authorization, renewal billing |
Retrying a Blocking dependency can double-charge, turning an outage into a trust incident |
Idempotency keys on payment, order creation and billing |
+ Retries on Blocking paths are safe. − Key storage |
No retries on writes |
|
ADR-011 |
Renewals are resumable |
Renewal run → billing |
One billing outage can fail an entire renewal run |
Per-subscription checkpoints, retries and dunning (Step Functions) |
+ A billing outage delays renewals instead of dropping them. − More orchestration |
One nightly batch |
|
ADR-012 |
Partners sit behind one adapter |
Subscription activation → partner provisioning API |
A partner outage would stop our own sale |
The adapter queues and retries; network policy blocks direct partner calls |
+ A partner’s blast radius ends at the adapter. − Activations can lag |
Direct calls; partner SLAs |
|
ADR-013 |
AI and data platforms are never Blocking |
Agent tools, MCP services, Databricks calls |
AI models and data platforms have their own failure modes |
Calls from Tier 1 and 2 services need a timeout and a fallback |
+ An AI or data outage never reaches a critical journey. − Simpler behavior during outages |
Trust their uptime |
|
ADR-014 |
Cells for Tier 1 services |
Price calculation, payment authorization, billing |
A Blocking dependency that fails, fails for every customer at once |
Run Tier 1 services in cells, each serving a slice of customers |
+ A Blocking failure reaches one cell, not everyone. − More infrastructure |
One shared fleet |
|
ADR-015 |
Shared platform services are Tier 1 |
Identity, API gateway, configuration |
They sit under every journey: the widest blast radius on the platform |
Highest availability target, multi-AZ and multi-region, own failure tests |
+ A platform-wide outage becomes rare. − Higher cost |
Treat them like any service |
|
ADR-016 |
Shed load to protect Tier 1 journeys |
Shared dependencies at peak |
Overload can make every dependency Blocking at once |
Checkout, delivery and renewal keep priority; recommendations and reviews are shed first |
+ Peak overload doesn’t reach Tier 1 journeys. − Simpler pages at peak |
Autoscaling alone |
|
ADR-017 |
Tier 1 changes roll out by cell |
Tier 1 services |
A bad change to a Blocking dependency has the same blast radius as an outage |
Canary per cell, automatic rollback on SLO breach |
+ A bad change reaches one cell. − Slower rollouts |
Big-bang deploys |
|
ADR-018 |
Every Degradable dependency has a kill switch |
Offers, recommendations, welcome offers |
In an incident, operators must cut a failing Degradable dependency now |
Feature flags (AWS AppConfig) switch it off in seconds |
+ Operators shrink blast radius in minutes. − Flag hygiene |
Hotfix deploys |
|
ADR-019 |
A fallback counts only after a failure test |
Every Degradable dependency on Tier 1 |
The riskiest case in the domain table: designed Degradable, measured Blocking |
Quarterly Fault Injection Service test |
+ The Degradable label is proven. − Test effort |
Code review |
|
ADR-020 |
Product owners approve every fallback |
Tier entitlement lookup, promo code validation |
A fallback changes what customers see or pay |
Each fallback’s customer experience is approved and recorded |
+ Containing an outage doesn’t create a pricing incident. − One sign-off per fallback |
Engineers decide alone |
|
ADR-021 |
New Tier 1 dependencies are declared before release |
New calls from Tier 1 services |
Each release can add a hidden Blocking dependency |
Declared in the repository manifest; the map verifies after release |
+ Blast radius can’t grow silently. − One manifest per service |
Review after incidents |
|
ADR-022 |
Open standards, on AWS |
The measurement pipeline itself |
The blast-radius map must outlive any vendor |
OpenTelemetry API in code, Iceberg for data, AWS settings only in configuration |
+ The map stays portable. − Fewer AWS shortcuts |
Commercial APM agents |
Rolling out the ADRs
Rolling out twenty-two ADRs is an organizational change, not a deployment. Five phases take us from seeing blast radius to governing it as routinely as cost and security.
|
Phase |
Strategic outcome |
Led by |
ADRs |
What leadership sees |
Proof it worked |
|---|---|---|---|---|---|
|
1. See it (0–3 months) |
One shared, trusted view of which services can stop which customer journeys |
Architecture office with platform engineering |
ADR-001, ADR-003 |
A blast-radius map for all five journeys, replacing design-document assumptions |
The map explains recent incidents across every journey |
|
2. Govern it (3–6 months) |
Blast radius becomes a design standard, not a lesson learned in incidents |
Architecture review board |
ADR-002, ADR-020, ADR-021 |
Every new design and Tier 1 change states its blast radius before approval |
No unapproved Blocking dependency reaches production |
|
3. Shrink the platform-wide risks (6–12 months) |
Remove the failures that can stop several journeys at once |
Platform engineering with domain leads |
ADR-004 to ADR-007, ADR-014 to ADR-016 |
Shared platform services, shared data and peak load no longer threaten the whole business |
Widest blast radius is one journey |
|
4. Separate the journeys (6–12 months, in parallel) |
Every journey, including delivery, subscriptions and partners, survives the others’ failures |
Journey owners, end to end |
ADR-008 to ADR-013 |
A failure delays its own journey but stops no other |
Each journey runs only on its approved Blocking list |
|
5. Make it routine (12 months onward) |
Blast radius is reviewed as routinely as cost and security |
Architecture office with business leadership |
ADR-017 to ADR-019, ADR-022 |
A quarterly blast-radius review alongside business reviews |
Fallbacks keep passing their failure tests; blast radius doesn’t creep back |
What’s next
Decisions only matter if we can tell they’re working. Part 3 covers the KPIs that show whether blast radius is shrinking, how we measure and alert on them, and how to keep it from creeping back.